Overview of Electrical Energy Planning in West Sumatera
DOI:
https://doi.org/10.25077/aijaset.v1i1.7Abstract
Electrical energy is one of the most important components in the development of an area. The development of sustainable development accompanied by rapid technological advances and an increase in living standards can cause the consumption of electrical energy to continue to increase, including in West Sumatra Province. To meet the needs of electrical energy in the future, it is necessary to build and develop the existing electrical system at PT. PLN (Persero) in order to serve the needs of electrical energy in the future. One of them is by predicting or predicting the demand for electrical energy in the next few years by utilizing historical data on the consumption of electrical energy in the past. In this study, the authors predict the electricity needs of West Sumatra Province from 2019 to 2028. The need for electrical energy tends to increase from year to year. In 2019 the need for electrical energy is 3,705 GWh, while in 2028 it is 6,980 GWh with an average growth in energy sales of 7.29 percent. The household sector has the highest demand for electrical energy in 2028, namely 3,769 GWh with an average percentage increase per year of 6.6 percent.
Keywords: Power system planning, Electrical energy consumption, Generation planning and Electrification ratio.
References
DPR RI “Laporan Kunjungan Kerja Komisi VII DPR RI Ke Provinsi Sumatera Barat”, 2019 [Online] Available : www.dpr.go.id
Hussein Seifi, M Sadegh Sepasian, “Electrical Power System Planning: Issues, Algorithms and Solutions”, Springer-Verlag Berlin Heidelberg 2011.
IESR (2019). Laporan Status Energi Bersih Indonesia: Potensi, Kapasitas Terpasang, dan Rencana Pembangunan Pembangkit Listrik Energi Terbarukan 2019.
Government Regulation No. 30/2009 about Electricity, 2009
PT. PLN (PERSERO) “RUPTL (Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2019 – 2028), 2019, [Online] https://web.pln.co.id/-stakeholder/ruptl
Direktur Bisnis Regional Sumatera PT PLN (Persero) “Persentasi Kunjungan Kerja DPR-RI Kondisi Kelistrikan Provinsi Sumatera Barat,” Padang, 2019
Dinas ESDM Sumatera Barat “ Persentasi Kunjungan Kerja DPR-RI Kondisi Kelistrikan Provinsi Sumatera Barat,” Padang : Kabid Energi dan Ketenagalistrikan” 2019.
PT. PLN (Persero) “RUPTL (Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2018 – 2027) [Online] https://web.pln.co.id/-stakeholder/ruptl
PT. PLN (Persero) “Diseminasi Rencana Usaha Penyediaan Tenaga Listrik PT. PLN (Persero) 2019 – 2028”, 2019, [Online] https://web.pln.co.id .
Pemerintah Provinsi Sumatera Barat “Potensi Sumber Daya Energi Sumbar”, 2019 [Online] https://www.sumbarprov.go.id
Outlook Energy, “Sekretariat Jenderal Dewan Energi Nasional”, ISSN 2527 3000. 2019. [Online] https://www.esdm.go.id/id/publikasi/indonesia-energy-outlook
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2022 Rizki Aditio Pribadi, Syafii Syafii

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.


