1.
Hasibuan A, Bintoro A, Salahuddin S, Meutia RD. Reliability Distribution System on Load Break Switch Addition at PT. PLN (PERSERO) ULP Langsa City Using RIA-SECTION Technique Combined Method on ETAP 14.1.0. aijaset [Internet]. 2022Jul.16 [cited 2024Dec.16];2(2):57 - 64. Available from: https://aijaset.lppm.unand.ac.id/index.php/aijaset/article/view/42